Difference between revisions of "GPG guide/Designer Timeline"

From LibrePlanet
Jump to: navigation, search
(Updating project calendar after 3rd meeting with Zak. Added some wiki table styles to make all columns same width.)
(Removed "get final text for guide on Friday the 30th bc I think it was outdated.)
 
(2 intermediate revisions by one other user not shown)
Line 11: Line 11:
 
! scope="col" | Sun, 25 May
 
! scope="col" | Sun, 25 May
 
|- style="vertical-align:top; width: 100%;"
 
|- style="vertical-align:top; width: 100%;"
| style="width:14%; text-align:left;" | -----
+
| style="width:14%; text-align:left;" |
 +
* ---
 
| style="width:14%; text-align:left;" |
 
| style="width:14%; text-align:left;" |
 
* #2 meeting with Zak.
 
* #2 meeting with Zak.
 
* Send rough drafts for the infographics.
 
* Send rough drafts for the infographics.
| style="width:14%; text-align:left;" | -----
+
| style="width:14%; text-align:left;" |
 +
* ---
 
| style="width:14%; text-align:left;" |
 
| style="width:14%; text-align:left;" |
 
* Make a storyboard for the infographics.
 
* Make a storyboard for the infographics.
Line 22: Line 24:
 
* Get feedback about infographics;
 
* Get feedback about infographics;
 
* Make the structure & layout for guide.
 
* Make the structure & layout for guide.
| style="width:14%; text-align:left;" | -----
+
| style="width:14%; text-align:left;" |
| style="width:14%; text-align:left;" | -----
+
* ---
 +
| style="width:14%; text-align:left;" |
 +
* ---
 
|-
 
|-
 
! scope="col" | Mon, 26
 
! scope="col" | Mon, 26
Line 37: Line 41:
 
* CSS and visuals.
 
* CSS and visuals.
 
|
 
|
* -> designers out <-
+
* ->designers out
 
|
 
|
* -> designers out <-
+
* ...
 
|
 
|
* -> designers out <-
+
* ... <-
 
|  
 
|  
` Get final text for the guide.
+
* ...
 
|  
 
|  
 
* Weekend sprint: working on the HTML and graphics for the guide.
 
* Weekend sprint: working on the HTML and graphics for the guide.
Line 75: Line 79:
 
* Last minute tweaks.
 
* Last minute tweaks.
 
|  
 
|  
* '''Ready to LAUNCH!!!'''
+
* '''LAUNCH!!!'''
| -----
+
* ---
| -----
+
* Finish project documentation
| -----
+
|
 
+
* ---
 +
|
 +
* ---
 +
|
 +
* ---
 
|}
 
|}

Latest revision as of 11:18, 2 June 2014

Timeline

Mon, 19 May Tue, 20 May Wed, 21 May Thu, 22 May Fri, 23 May Sat, 24 May Sun, 25 May
  • ---
  • #2 meeting with Zak.
  • Send rough drafts for the infographics.
  • ---
  • Make a storyboard for the infographics.
  • Finish and send storyboard;
  • Get feedback about infographics;
  • Make the structure & layout for guide.
  • ---
  • ---
Mon, 26 Tue, 27 Wed, 28 Thu, 29 Fri, 30 Sat, 31 Sun, 1
  • HTML template for the guide;
  • CSS and visuals.
  • ->designers out
  • ...
  • ... <-
  • ...
  • Weekend sprint: working on the HTML and graphics for the guide.
  • #3 meeting with Zak
  • Weekend sprint: working on the HTML and graphics for the guide.
  • Delivered first version of the main infographics + HTML draft layout.
Mon, 2 Tue, 3 Wed, 4 Thu, 5 Fri, 6 Sat, 7 Sun, 8
  • Update guide's HTML with the latest Text Draft;
  • Add comments to HTML document to explain structure and email Zak -> after this text is updated directly in HTLM;
  • Troubleshooting the git static repository;
  • Finished layout for the guide.
  • Revise and finish main infographics;
  • Finished design for the guide;
  • Deliver FSF Campaigns Graphic (300x300 px).
  • Deliver Homepage feature graphic (500x660 px).
  • Test guide;
  • Text revision;
  • Graphics revision;
  • Last minute tweaks.
  • LAUNCH!!!
  • ---
  • Finish project documentation
  • ---
  • ---
  • ---