Difference between revisions of "GPG guide/Designer Timeline"

From LibrePlanet
Jump to: navigation, search
m (Timeline)
(Removed "get final text for guide on Friday the 30th bc I think it was outdated.)
 
Line 47: Line 47:
 
* ... <-
 
* ... <-
 
|  
 
|  
* Get final text for the guide.
+
* ...
 
|  
 
|  
 
* Weekend sprint: working on the HTML and graphics for the guide.
 
* Weekend sprint: working on the HTML and graphics for the guide.

Latest revision as of 11:18, 2 June 2014

Timeline

Mon, 19 May Tue, 20 May Wed, 21 May Thu, 22 May Fri, 23 May Sat, 24 May Sun, 25 May
  • ---
  • #2 meeting with Zak.
  • Send rough drafts for the infographics.
  • ---
  • Make a storyboard for the infographics.
  • Finish and send storyboard;
  • Get feedback about infographics;
  • Make the structure & layout for guide.
  • ---
  • ---
Mon, 26 Tue, 27 Wed, 28 Thu, 29 Fri, 30 Sat, 31 Sun, 1
  • HTML template for the guide;
  • CSS and visuals.
  • ->designers out
  • ...
  • ... <-
  • ...
  • Weekend sprint: working on the HTML and graphics for the guide.
  • #3 meeting with Zak
  • Weekend sprint: working on the HTML and graphics for the guide.
  • Delivered first version of the main infographics + HTML draft layout.
Mon, 2 Tue, 3 Wed, 4 Thu, 5 Fri, 6 Sat, 7 Sun, 8
  • Update guide's HTML with the latest Text Draft;
  • Add comments to HTML document to explain structure and email Zak -> after this text is updated directly in HTLM;
  • Troubleshooting the git static repository;
  • Finished layout for the guide.
  • Revise and finish main infographics;
  • Finished design for the guide;
  • Deliver FSF Campaigns Graphic (300x300 px).
  • Deliver Homepage feature graphic (500x660 px).
  • Test guide;
  • Text revision;
  • Graphics revision;
  • Last minute tweaks.
  • LAUNCH!!!
  • ---
  • Finish project documentation
  • ---
  • ---
  • ---